Posted by Kanga.

We are finally seeing some progress above ground on the metro construction out our window. Compare to how it looked back in September 2008.
The traffic flow isn’t quite normal, yet. However, the main flow is not diverted around the back of our building, so it is much easier to exit our parking garage due to less traffic on that street. It is also easier to tell taxis where to drop us off and there is a safe area for them to pull over and let us out. Much improved.

